ECE Offshore has signed a contract with Ballast Nedam Infra B.V. for the installation of the submarine power cables on Windplanblauw. The scope includes:
- installation of 5 export cables and 19 inner-array grid cables
- cable burial up to 2m depth
- Bathymetric surveys
- Pre-lay grapnel run
Work has been completed in Q2 2023.